Kitchen & Bathroom remodeling

Kitchens and bathrooms fail differently than the rest of a house — water, heat, and daily use concentrated into a small footprint, which means the plumbing and waterproofing underneath the finish matter as much as the finish itself. We remodel both with the same order of operations every time: what's behind the walls gets checked and fixed first, then the layout and finishes get built on top of something solid.

  • Plumbing and electrical inspected and updated before any finish work begins
  • Proper waterproofing behind tile and around fixtures — not just caulk and hope
  • Design consultation included so the layout works before demo starts

Kitchen and bathroom remodeling across Auburn, Hoover, and Atlanta — built right behind the walls, not just finished nicely on top.

A kitchen or bathroom remodel lives or dies on what's happening behind the tile and under the cabinets, not just what it looks like when it's done. Bathrooms fail early when waterproofing behind the tile is skipped or done thin, which shows up months later as soft subfloor or mold nobody sees until it's already spread. Kitchens run into trouble when electrical isn't updated to handle modern appliances, or when plumbing gets worked around instead of properly rerouted for the new layout. We start every remodel with what's underneath: checking plumbing lines for age and condition, verifying electrical can handle the finished layout, and building proper waterproofing membrane behind any tile that's going near water — showers, tub surrounds, backsplashes. Once that's solid, the visible work follows: cabinetry, countertops, fixtures, and tile, installed to a layout we walk through with you before demo ever starts, so there are no surprises about where the sink ends up or whether the island fits. It's a slower way to remodel than tiling straight over what's there, but it's the difference between a remodel that looks good on move-in day and one that still looks good five years later.

Our Core Services

Repair or Replace?

If your roof is under 15 years old and the damage is localized, repair almost always makes sense. Past 20 years, or with damage across multiple slopes, replacement is usually the cheaper long-term call. We tell you which one you're looking at before we quote it.

Materials

Architectural asphalt shingles as standard, with metal, tile, and impact-rated options available. We walk you through what actually holds up in your climate rather than what's sitting in the warehouse.

Timeline

Inspection within 48 hours of your call. Most repairs done same-week. A standard residential replacement takes one to two days start to finish, including cleanup and magnetic nail sweep.

What It Costs

Pricing depends on square footage, pitch, layers to remove, and decking condition. You get a written, itemized quote after the inspection — not a number over the phone we revise later.

Feel free to contact us

Keep In Touch With Us

Water doesn't flood a basement at a convenient hour. Pipes burst overnight. Storms roll through at 3 a.m. Fire crews leave, and then you're standing in the dark wondering who to call.